I have not blogged in forever! Someone was just asking me about it and I confessed that the reason is that Facebook has pretty much taken up my online social time. It's been fun to reconnect with friends and see their photos and what they are all up to!
So what's new here...we're on snowday #3 due to our October snowfall. We were blessed with about 2 feet of powder here in Parker and are getting ready for our first trip to ride our skis! The kids had a boring fall break, as I came down with the flu :( But I'm on the mend and grateful for it.
In other news, the kids are back at swimming. This is MBJ's first time on a swim team. He is really liking it so far. Life is busy with my being back in school and juggling the house and kiddos schedule. But it's a good kind of hectic, my favorite!
I'll try to post more often, though most of the people who would even read this are probably on FB and know what's going on already :)
I took the above picture when we were in Cape May, NJ. for Lizzie's boot camp graduation.
October 2007
October 2007
Friday, October 30, 2009
Thursday, April 9, 2009
Office Before/After
Wowzas I haven't blogged in forever. Since January we have been really wrapped up in home improvements and then came spring break. And admittedly, Facebook has taken up much of my online time since I finally got a page set up. And that has been very cool finding so many friends on there.
Okay, the office. Here we have some before pics. It was all brown, brown stained moulding, brown/beige paint and carpet, and since we own reddish/brown office furniture, it made me ill. Ugly room. We have a fireplace in here and it had no mantle, it just looked unfinished. The tile that was there was old and chipping.
So Marty ripped out the tile, the carpeting, and took down the dated moulding. Buh bye.
I knew once I first saw the fireplace wall that I was going to tile the entire thing. I have watched too much HGTV :) But it turned out awesome. We chose a slate 3x6 tile, the hearth floor tile is a matching slate. Before we tiled I repainted the built ins and chose a warm honeyish color for the walls. I thought it complemented the tile and soon to be installed bamboo flooring nicely. Marty put the bamboo in after everything else was complete and viola. Believe it or not this room makeover took less than a week, and Marty worked during the days thru it all. LOVE this room now!!
Okay, the office. Here we have some before pics. It was all brown, brown stained moulding, brown/beige paint and carpet, and since we own reddish/brown office furniture, it made me ill. Ugly room. We have a fireplace in here and it had no mantle, it just looked unfinished. The tile that was there was old and chipping.
So Marty ripped out the tile, the carpeting, and took down the dated moulding. Buh bye.
I knew once I first saw the fireplace wall that I was going to tile the entire thing. I have watched too much HGTV :) But it turned out awesome. We chose a slate 3x6 tile, the hearth floor tile is a matching slate. Before we tiled I repainted the built ins and chose a warm honeyish color for the walls. I thought it complemented the tile and soon to be installed bamboo flooring nicely. Marty put the bamboo in after everything else was complete and viola. Believe it or not this room makeover took less than a week, and Marty worked during the days thru it all. LOVE this room now!!
Friday, February 6, 2009
And the fireplace.
As we finished the bathroom we thought, life would just be too peaceful to relax now. So we decided to reface our fireplace, one side of it. Now this picture is of the OFFICE side of the FP, but we replaced the other side, the family room side. I forgot to take a before pic of that side. So today I snapped a shot of the other side, it was a traditional black/brass like this side. The tiles were chipping, and are on this side. So we hacked off the old beige tiles and got to it.
Sparing you all of the in progress pics, which there aren't any...this tile job was smooth sailing and done in an evening. We repainted the trim around the glass with a hammered silver finish, which was not totally dry yet.
And to pull it all together...
When Marty was at work one day, while the whole bathroom was still being finished up, I decided it was time to paint the bedroom. It was very cool to surprise him when he got home! At this point we have repainted almost every room in the house. The ENTIRE thing was beige, ceiling to floor, in almost every room. And it was OLD paint, very grimy, so no...we aren't crazy, we just new moving in here, that it would all need to get done ASAP. The curtains do not make their appearance in these photos b/c they were not up yet. They are a goldish sheer panel.
Our new bathroom!!!
Well alrighty then! The bathroom is finished! Except for the cabinet/counter/sinks/mirror/light situation, but we'll make that a simple weekend project in a monthe or two. ;) After the tiling was done we had to paint the walls, we did the ceiling before we laid tile.
New shower heads.
In progress...
During Lizzie's visit, primarily when the kids, Lizzie, and I spent a day at the science museum, Marty demo'ed the bathroom. He ripped out all the carpet, took out the trim, ripped down the walls with tile on them, sealed the subfloor where it needed it, etc. He replaced the missing drywall and put down backerboard where it needed to go. All of that took a week or two, as he did it in his off work hours. And THEN, we started tiling. We did the shower first.
I had chosen the accent tile before anything else. We had a few other options that were nice, but the floor tile sealed our choice when we found it. The tub/shower tile was chosen simply b/c it complemented the others well enough.
Subscribe to:
Posts (Atom)